top of page

PROJECTS AND ACHIEVEMENTS

Ancre 3

Offices & Retail

  • Construction works of the Belgian Embassy in Kinshasa (5000m2) 2017

  • CAP CONGO/WGC (subcontractor) /2019 Construction of an R+3 building on an area of 8500 m² on Avenue Goodyear/Kinshasa-Limete.

    Other achievements:

  • DGM/Actif Group/2015 Construction of annexes to the administrative office of the general management in Kinshasa (200m²)

  • PAP/DP2/FED/Actif Group/2014 Development of multipurpose rooms on the sites of the People's Palace and the Kinshasa Provincial Assembly

  • PA2D/FED/Actif Group/2015 Work to secure and rehabilitate the premises of the urban division of decentralization and customary affairs in the city of Kinshasa.

  • PROGRESS/FED/Actif Group/2016 Partitioning works for the offices of the IT department of the General Secretariat for National Defense (DINFOR) at the Ministry of Defense in the EMG-FARDC building.

  • BAT CONGO/Actif Group/2013 Rehabilitation and extension works of the technical workshops (400m²)

  • Embassy of Belgium 

Public, education, sport & leisure

   

  • Rehabilitation of UNIKIN student homes From January 2020 to December 2020Other achievements

  • Congregation of the Barnabites Sisters/Active Group/2017 Construction works of an orphanage in the commune of Mont Ngafula R+1 (1000m²)

  • In-depth rehabilitation of homes 10, Vatican and plateau. (Carpentry, Painting, Tiling, Plumbing).

Current projects

  • Ministry of ITP: Erosion control works at the Masikita/Ngaliema site Construction of gutters, collectors, drop chambers and weir Civil engineering works.

  • Ministry of ITP: Rehabilitation of Kwamouthe Avenue (505.00 m) Construction of the roadway, sidewalks, gutters and crossings Civil engineering works

  • BBC/WG building (subcontractor): R+2 commercial building from 22/08/2018 to 26/11/2019 Construction of a R+2 building on an area of 1500m2 on Avenue du Poids Lourds/Kinshasa- Lime.

​    _cc781905-5cde -3194-6bb3b-5

  • Bysebo Lodge/Actif Group/2013 Creation of a tourist site with the construction of 8 bungalows of 70m², a clay tennis court, a multipurpose room with restaurant and a pier on Kasonga Island in Goma.

  • Architect: Active design office

  • Villa Nimy/Actif Group/2015 Rehabilitation and renovation work on a private residence on Avenue Tshatshi in the commune of Gombe in Kinshasa (800m²).

  • Kampia Wassele/Actif Group/2016 Construction works of two semi-detached villas on the shores of Lake Tanganyika in Kolwezi (600m²)

  • Chalet Mitendi/Actif Group/2017 Construction work for a chalet and its outbuildings in the Masanga farm at Mitendi in Kinshasa (600m²)

  • TATA ZAHIRA/Construction assets/2017

  • L. LINGWALA PROPERTIES: Construction of a R+4(-1) mixed-use building on an area of 3600 m2. Gros œuvre           _cc781905-5cde -3194-bb3b-136bad5cf58d_         _cc781905-5cde-3194-bb3b- 136bad5cf58d_           _cc781905-5cde- 3194-bb3b-136bad5cf58d_                _cc781905-5cde- 3194-bb3b-136bad5cf58d_ Construction of the roadway, sidewalks, gutters and crossings
    Particular client.

Social housing :

  • Congregation of the Barnabites sisters/Active Group/2017 Construction works of an orphanage in the commune of Mont Ngafula R+1 (1000m²).

Residential:

  • Bysebo Lodge/Actif Group/2013 Creation of a tourist site with the construction of 8 bungalows of 70m², a clay tennis court, a multipurpose room with restaurant and a pier on Kasonga Island in Goma.
    Architect: Active design office.

  • Villa Nimy/Actif Group/2015 Rehabilitation and renovation work on a private residence on Avenue Tshatshi in the commune of Gombe in Kinshasa (800m²).

  • Kampia Wassele/Actif Group/2016 Construction work for two semi-detached villas on the shores of Lake Tanganyika in Kolwezi (600m²) Chalet Mitendi/Actif Group/2017 Construction work for a chalet and its outbuildings in the Masanga farm at Mitendi in Kinshasa (600m²)

  • TATA ZAHIRA/Active construction/2017.

Building team:

  • Integrated border post, Lufu (Bas-Congo) / Guangping International / Actif Group / 2016 Construction in progress of an integrated administrative building (1200m²)

Building L. PROPERTIES (Kinshasa-Lingwala) /EITHEC/WG CONTRACTOR/2018 Ongoing construction of a R+4(-1) building for mixed use (3600m²)

  • Building (Kinshasa-Limete) /Actif Group/ Construction of a R+5 building on an area of 1096 m².

  • Sanitation works on the railway line in Kinshasa (Komoriko axis) / RATPK/Actif Group/2016 Construction of gutters along the railway line (3km) and a metal bridge to support the cables.

bottom of page